Hidden Valley area gets road work Tuesday

An area of Hidden Valley north of SR 84 and east of SR 347 will be treated with asphalt rock dust palliative to reduce dust and smooth the road surface. The affected area includes the following streets:

• Carefree Place (from Maricopa Road east to Pepper Place)
• Desert Park Lane (from Meadowview Road north to Carefree Place)
• Cherry Lane (from Meadowview Road north to Carefree Place)
• Primrose Lane (from Meadowview Road north to Carefree Place)
• Pepper Place (Meadowview Road north to Carefree Place

This pavement preservation project is likely to begin Tuesday, June 1. However, this type of road project is highly dependent on weather conditions. 

Residents will be notified by a paper notice or flyer to indicate the date their streets will be upgraded. There may also be directional signs on major roads. Residents should note and follow the instructions or information contained on the leaflet or on posted signs.

Please be alert to possible traffic delays. Drivers are urged to obey the speed limit and all posted signs and barricades while traveling through these construction zones.

For more information, contact Pinal County Public Works 520-866-6411 or email [email protected].