Christ’s Church of the Valley gets an administrative design review of plans and off-site improvement permit for its church building, parking lot and sports fields at 19475 N. Porter Road. The church will begin construction of an in-ground, 750-square-foot baptistry and outdoor kitchen with combined construction cost of nearly $300,000. Work will be done for CCV Honeycutt & Porter Road LLC by ProFab Construction LLC.

Maricopa begins construction of its Police Department building at Civic Center Plaza on the northeastern corner of North Maya Angelou Drive and Bowlin Road. The $25.4 million million project will be built by Caliente Construction Inc.

Construction will begin on the clubhouse for Home @ Maricopa Apartments, 17645 N. Porter Road, at a cost nearly $1 million. Owner SAM MC I LLC contracted SAM Construction Group LLC.

Homestead North will build a 1,054-square-foot, metal, shade structure at 20663 N. Wilford Ave. for nearly $12,000. Shade Net of Arizona will do the work.

A 45- by 12-foot, galvanized, baseball, dugout cover and chain-link fence will be added to the baseball field Desert Sunrise High School, 16200 N. Murphy Road. The work will be done by Adams Fence LLC for Maricopa Unified School District.

The medical campus at Copper Sky Park-District 3 received a major development-review permit from the city, enabling the project to move forward.

A minor development-review permit was granted to Cypress Investors LLC for Carl’s Jr. restaurant with drive-through at 20015 N. John Wayne Pkwy. in Maricopa Towne Plaza.

Construction will begin on 14 duplexes, comprising 28 total units, at Hampton Edison, 45305 W. Edison Road. This phase includes six duplexes featuring 1,020-square-foot, two-bedroom units on each side. Eight additional duplexes are 645 square feet with one-bedroom residences on each side. Cost of this phase is $3.4 million. Work is being done by Beckshar Diamond Commercial LLC.

REV@Porter will build 10 duplexes (20 residences) in three configurations at 17805 N. Porter Road. Seven duplexes will feature a 782-square-foot, one-bedroom residence on one side and a 1,093-square-foot, two-bedroom residence on the other. Two duplexes will have one-bedroom units on each side, and one duplex will have two-bedroom residences on each side. Cost is $2.9 million. Sodella Construction Inc. is doing the work.

Grading and drainage work will begin at the Tractor Supply Co. site, 42000 W. Maricopa-Casa Grande Highway in the Maricopa Power Center at the Wells. T&K Contracting will do the work for owner CAPDEVL060.

An above-ground, fuel tank will be installed at Desert Sunrise High School, 16200 N. Murphy Road, by Chasse Building Team for Maricopa Unified School District.

Century Communities of Arizona will spend $110,000 to convert a garage at a home at 35320 W. Mallorca Ave. to a sales office for The Trails. Century will do the work itself.

A final plat was approved for the infrastructure for Phase 4 of the Sorrento community for owner Azalta LLLP.